The Load Lifting Approved Code of Practice states " 4.4.1 Do not use wire rope (bulldog ) grips on any load-hoisting rope . They are only suitable for forming an eye on stays or guys."
No: 08 21 September 2007
A crane lifted platform is the piece of equipment from which employees carry out their work which is either attached to the crane's hook or the head of the crane's boom.
No: 02 13 December 2000
A Code of Practice for lifting precast concrete panels is being developed. However, it will will not be sufficient aline to prevent accidents as there appears to be a lack of understanding throughout the industry of concrete lifting anchor design principles.